THE POOL (End July2019)

We are very excited to announce that our brand new swimming pool will be up and running by the end of July 2019.

It is indeed rare to find such a wonderful facility in a traditional town house in Alcala la Real.

The beautifully authentic handmade and hand painted cerámic tiles have been crafted locally by alcalaino and artesan Salvador Ruiz Perez, whose alfarería is literally round the córner from Atelier88, we are so happy about this.

Having spent one summer here already we know that it will be much appreciated by our guests when the temperatures soar during the summer months.

The pool will be heated by solar heated water so we are anticipating that it will be accessible all year round.

The dimensions are roughly 8mx4mx7mx3m (not a regular shape).                   The water is 1 metre deep, the mínimum depth required for a swimming.